The arrival of the prototype at the Hidria location in Koper
Date: 22. 12. 2022
Our subcontractor, the company Protecmed from Spain, completed the construction of the Hidaqua prototype in November 2022, which was ordered in March 2022. The prototype was successfully transported to the Hidria company location in Koper, Slovenia on December 22, 2022.